Astún–Candanchú Gondola Construction Nears 50% Completion Ahead of 2027/28 Opening

The new 3.6-kilometre gondola will connect two ski resorts in Spain’s Aragonese Pyrenees, creating a combined ski destination with more than 100 kilometres of slopes. However, the publicly funded project continues to face environmental opposition.

Construction of the new gondola linking Astún and Candanchú, two established ski resorts in Spain’s Aragonese Pyrenees, is approaching the halfway point, with the first lift towers being installed ahead of the winter season.

According to Aragón Noticias, approximately 50% of the construction work has now been completed. The project is scheduled to become operational towards the end of 2027, in time for the 2027/28 ski season.

The new connection represents one of the most significant current infrastructure developments in the Spanish Pyrenees, aiming to improve access between the two resorts and strengthen the year-round tourism offer of the Aragón Valley.

Continue reading “Astún–Candanchú Gondola Construction Nears 50% Completion Ahead of 2027/28 Opening”

Courmayeur’s €40 Million Lift Transformation Takes Shape

The new Plan Chécrouit lift hub under construction, where two new 10-passenger gondolas will begin operation for Winter 2026/27.

Exclusive photos reveal major progress on two new 10-passenger gondolas

Visitors arriving at Courmayeur this summer are being greeted by one of the largest infrastructure projects currently underway in the Alps.

Construction is progressing rapidly on the resort’s new lift hub at Plan Chécrouit, where two modern 10-passenger gondolas are rising from the foundations and will transform skier circulation for the 2026/27 winter season.

Continue reading “Courmayeur’s €40 Million Lift Transformation Takes Shape”

La Thuile Replaces Two Ageing Chairlifts with Major Gondola Upgrade for 2026/27

Pista 3, Franco Berthod, a renown super steep black run in La Thuile. Photo: Tourism Office La Thuile.

Italian resort La Thuile is preparing one of its biggest lift infrastructure upgrades in recent years, with a new 10-seater gondola set to replace two of the ski area’s older chairlifts ahead of the 2026/27 winter season.

The project will replace the ageing La Combe and Chaz Dura fixed-grip chairlifts on the front side of the mountain, one of the main circulation areas linking the Italian resort with the wider Espace San Bernardo ski domain shared with La Rosière in France.

According to local and regional reporting, the new gondola — officially referred to as the Les Suches–Chaz Dura telecabina — is designed to significantly improve uphill transport capacity, skier flow, and beginner access on one of the resort’s busiest sectors.


Update — October 2026: La Thuile’s new gondola will be called Vedette, with opening planned for December 2026. Its design draws inspiration from historic Alpine fortifications, while a panoramic restaurant is expected to follow in December 2027. Read our latest update on the Vedette gondola, its name and the story behind its architecture.


Continue reading “La Thuile Replaces Two Ageing Chairlifts with Major Gondola Upgrade for 2026/27”