Ski Resorts by Train from London: The Alps and Pyrenees — Winter 2026/27

A train passing the Morteratsch Glacier on its way from Bernina to Pontresina, Switzerland. Photo: Sepp Rutz. Unsplash.

From the French Alps to the Dolomites, Switzerland, Austria and the Pyrenees, discover how to reach European ski resorts by train from London — including sleeper services, onward buses, journey planning and the connections that still need confirmation.

There is something special about starting a ski holiday on a train.

Instead of heading to an airport, checking in luggage and waiting for a flight, travellers can board a train in central London, settle into their seats and watch the landscape change as they cross Europe towards the mountains.

For some ski resorts, the train takes passengers directly into town. For others, the journey involves a combination of high-speed trains, regional railways, buses, gondolas and private transfers.

Travelling by train is not necessarily cheaper or faster than flying. But it can be a more enjoyable way to travel, with more freedom to move around, appreciate the scenery and make the journey part of the holiday itself.

This guide explores how to reach ski resorts in the Alps and Pyrenees from London during winter 2026/27, covering France, Switzerland, Italy, Austria, Germany, Slovenia, Spain and the Principality of Andorra.

Continue reading “Ski Resorts by Train from London: The Alps and Pyrenees — Winter 2026/27”

Courmayeur’s €40 Million Lift Transformation Takes Shape

The new Plan Chécrouit lift hub under construction, where two new 10-passenger gondolas will begin operation for Winter 2026/27.

Exclusive photos reveal major progress on two new 10-passenger gondolas

Visitors arriving at Courmayeur this summer are being greeted by one of the largest infrastructure projects currently underway in the Alps.

Construction is progressing rapidly on the resort’s new lift hub at Plan Chécrouit, where two modern 10-passenger gondolas are rising from the foundations and will transform skier circulation for the 2026/27 winter season.

Continue reading “Courmayeur’s €40 Million Lift Transformation Takes Shape”